Verona |
Code of Ordinances |
Title 15. Building Code |
Chapter 2. Construction Site Erosion and Stormwater Runoff Control |
§ 15-2-12. Off-Site Stormwater Management.
The City may establish off-site stormwater management and associated fees, provided that provisions are made to manage stormwater by an off-site facility, and provided that all of the following conditions for the off-site facility are met:
(a)
The facility is in place;
(b)
The facility is designed and adequately sized to provide a level of stormwater control that at least meets the City's ordinance standards;
(c)
The City is satisfied that the facility has a legally obligated entity responsible for its long-term operation and maintenance.
( Ord. No. 17-907, 12-18-17 )