§ 15-2-11. Stormwater Management Goals.  


Latest version.
  • The following standards shall be met whenever possible, and proposed design, suggested location and implementation of practices to meet these goals shall be included in plans:

    (a)

    For existing development, design practices to retain soil particles greater than forty (40) microns on the site (twenty percent (20%) reduction) resulting from a one-year, 24-hour storm event, assuming no sediment resuspension.

    (b)

    For street reconstruction, design practices to retain soil particles greater than twenty (20) microns on the site (forty percent (40%) reduction) resulting from a one-year, 24-hour storm event, according to approved procedures, and assuming no sediment resuspension.

( Ord. No. 17-907, 12-18-17 )